Skip to content

Westall Schools Regeneration and Modernisation - Westall, VIC

The Victorian Government is investing in the future of Westall through the Westall Schools Regeneration and Modernisation Project, supporting upgrades to both Westall Primary School and Westall Secondary College. Works include a new PE and gymnasium facility with external courts, a new learning centre, and a hub link to the Kingston City Community Hub.

Project Design Brief

The project required several large roof catchments, to be used to recycle stormwater across both school sites. The design intent was to provide a secure and sustainable water supply for irrigation of natural playing fields, landscaped areas, and school gardens. To achieve this, a complete on-site stormwater retention system was required, offering high storage, structural stability, and full accessibility for inspection and maintenance, including CCTV and jetting, from a select number of access points.

ACO's Solution

Benefits

  • ACO StormBrixx SD is strong and quick to assemble. It is installed in a brick bonded and cross bonded configuration for optimal stability.
  • Optimum storage capacity with 97% void ratio of total volume
  • The open cell structure permits completely free access for CCTV and jetting equipment which allows the whole system, including all the extremities, to be inspected and maintained from a few access points.
Download this case study
Westall Schools Regeneration and Modernisation
ACO. we care for water
Back To Top
 Popular Searches  Hide Popular Searches