skip to Main Content

Request design assistance

The following information is required to provide a recommendation for a simple run of trench drainage. On receipt of this form, ACO will provide a recommendation with hydraulic calculations where necessary.

For more complex layout please contact ACO.

    CATCHMENT HYDRAULICS

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    TRENCH DRAIN INFORMATION

    A (m)

    B (m)

    Please select

    OTHER INFORMATION

    Trench hydraulic flow informationGrating intake performaceLayout schedule and parts listSurface water storage solutionsPlease contact me to discuss

    ADDITIONAL RUNS

    Run 2

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    A (m)

    B (m)

    Please select

    Run 3

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    A (m)

    B (m)

    Please select

    Run 4

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    A (m)

    B (m)

    Please select

    Run 5

    years

    Left (m)

    Right (m)

    such as downpipes, machinery etc. (L/s)

    A (m)

    B (m)

    Please select


    Catchment Area
    Rainfall Intensity
    Ground Slope
    Slope Crossfall
    Central To Width
    Outlet Position
    Catchment Length
    Load Class Table
    SUBSCRIBE
    Close
    SUBSCRIBE
    Close
    Popular Searches Hide Popular Searches
    Back To Top